Infra Update – September 2016

Download (PPTX, 5.65MB)

Completed:

  • Providing and laying of Asphalting using 60/70 grade bitumen From Wipro Gate 5 to Wipro Gate 16 (West Phase).
  • Concrete Pavements along Doddanagamangala Village Road (Phase 2).
  • Construction of 20 feet deep well Rainwater Harvesting Pit 47 Nos at Various locations – Completed. (West & East Phase)
  • 16 e-toilets Installed at various location of Electronics City and Operational– Completed.  (West & East Phase)
  • Kerbstone Painting work at Velankani Road, HP Avenue & Wipro Avenue etc., (West Phase)
  • Pot Hole filling work at Electronics City. (West & East Phase)
  • Replacing the existing chamber cover with RCC heavy slab with Chequer Plate. (West Phase)
  • Road Widening from RS Electronics to Flextronics, RS Electricals & Pumphouse (West Phase)
  • Barbed wire Fencing at Pumphouse to protect Trespassers. (West Phase)
  • Petty Shop Removed and covered at Tech Mahindra road. (East Phase)
  • Removing the existing pavers & laying the new Pavers at Salarpuria Info Zone. (West Phase)
  • RCC Drain work at C-Dac. (West Phase)
  • Construction of Drain & Cover slab work at KSSIDC Complex. (West Phase)
  • Construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs From Wipro Gate 5 to Wipro Gate 16. (West Phase)

 In progress:

  • Kerbstone Raising work at KSSIDC Complex. (West Phase)
  • Construction of RCC Culvert in front of MSME. (West Phase)
  • Laying Kerbstone for 300KLD STP Road. (West Phase)
  • Construction of 6KL capacity sump at KIADB land. (East Phase)
  • Construction of RCC Drain at Doddathogur Village. (West Phase)
  • Providing Sewer line at Canara bank road. (West Phase)
  • Construction of SSM Drain work along Rajakaluvae to continue the Footpath
  • Construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs
      • Along TCS Road. (East Phase)
      • Along Goa Estate. (West Phase)
      • Along Ramsoft Road. (West Phase)
      • At Ramakrishna Hospital. (West Phase)
      • At Celstream. (West Phase)
      • At Amphenol. (West Phase)
      • At JP IT Park road. (West Phase)
  • Property Inventory, Asset Management and Development of Web-based GIS Application Software for e-Governance and Management of Electronic City Industrial Township Authority (ELCITA), Bangalore.  (West & East Phase)
  • M/s mayaPRAXIS had submitted the Draft preliminary feasibility Report on Skywalk system, Electronics city West phase for approval.

Contracts Awarded:

  • Providing and laying of Asphalting using 60/70 grade bitumen along
    • Café Corner & JP IT Park Road
    • MSME Entry Gate to Exit Gate for 300KLD STP
    • KSSIDC Complex Road

Construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs along

  • TCS Road

Contracts Anvil:

  • Providing House Keeping Services to ELCITA within Ecity Industrial Area.
  • Providing Security Services to ELCITA within Ecity Industrial Area.
  • Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs along
    • XIME Road
    • Petrol Bunk Road & Golden Tulip Road
  • Landscaping work below fly over. (West & East Phase)
  • Providing UGD to connect industries in cluster 2 & 3 to the 300 KLD STP.
  • Construction of 500 KLD STP in KIADB Land, Electronics City (East Phase)